A German cement plant commissioned Lechler to optimize the injection system of the gas cooling tower (GTC). The aim was to further increase the control range of the spillback nozzles (control ratio 10:1) in order to achieve a minimum volume of 1.5 m³/h without switching off nozzle lances. At the same time, efficiency should be increased and energy costs reduced.